How to sign off a design before build

Zahid Younis
Co-founder and CTO · · 32 min read
How to sign off a design before build

Sign off a design only when every screen, state and flow in scope has been reviewed against the user stories, tested with a clickable prototype, checked by a developer for feasibility, and approved in writing by one named person before build starts. Changes after sign-off should go through a change log, because a change made once code exists typically costs several times more than the same change made in design.

We have taken apps from first sketch to launch for Superdry, which spans 768 locations in over 100 countries, and for Dabbl, a trading app for first-time investors, and the pattern holds in both: the projects that stayed on budget were the ones where design sign-off was a real decision, not a nod in a meeting. This guide shows what to check, who should approve, what to freeze and what happens when you want to change your mind. Our services page shows where design sits in a typical project, and you can see the finished result of careful design work in the Dabbl case study.

Key facts

  • Sign-off is the point where design becomes the specification for build. It should be a written, dated approval by one accountable person.
  • A sign-off package has five parts: screens, states, flows, content and a design system, plus a short list of known exclusions.
  • Check accessibility and store rules before sign-off, not after. Fixing them in code is slower and dearer.
  • Ask a developer to review feasibility before you approve. Beautiful designs that cannot be built as drawn cause rework.
  • Rounded Labs works to a fixed price agreed before development starts, so a clear sign-off is also what protects your budget. See the pricing page.
  • Anything not in the signed-off package is a change. Changes are logged, sized and decided before any work starts.

What does design sign-off actually mean?

Sign-off means you accept that the approved designs describe what will be built, and that anything different later is a change. It is a contract moment between you and the team, even if no one calls it that. Before sign-off, the design is a conversation. After it, the design is an instruction.

It does not mean the design is perfect. It means the design is complete enough to build from and good enough to launch with. Real feedback from real users arrives after launch, and your version two will use it. Treating sign-off as a hunt for perfection delays projects. Treating it as a rubber stamp builds the wrong thing.

If you are new to reading designs, start with How to review app designs as a non-designer, which covers what to look at on each screen. This post covers the decision that comes after that review.

What sign-off is not

Several things get confused with sign-off, and each one causes trouble when mistaken for the real thing.

  • Liking the look. Approving the visual style (colours, type, imagery) is one part of sign-off. It is not the whole of it. A beautiful home screen tells you nothing about whether the password reset flow works.
  • A verbal nod in a meeting. If it is not written down with a date and a version, it will be remembered differently by each person in the room.
  • An approval by everyone. Five people approving means no one is accountable. Input from many, approval from one.
  • A promise that nothing will change. Change is normal. Sign-off simply makes change a visible, priced decision rather than a quiet drift.
  • The end of design. Design work continues during build: developers ask questions, edge cases emerge and small gaps are filled. Sign-off fixes the agreed scope, not the designer’s availability.

The three levels of approval

Most projects pass through three approvals, and it helps to keep them distinct so that nobody believes the final one has happened when only the first has.

Level What is approved Typical output Risk if skipped
Direction Look, feel and tone, key screens Mood boards, a handful of styled screens Rework of the whole visual style later
Flow How people move through the app Wireframes, user flows, clickable prototype Missing journeys, confusing navigation
Final sign-off Every screen, state and piece of content in scope Full design set, design system, exclusions list Building from incomplete or contested designs

This post is about the third level. It assumes the first two have been done and that you have a prototype you can hold in your hand.

Why does sign-off matter so much for cost?

Software is cheapest to change when it is still a picture. A designer can move a button, reorder a flow or rewrite a label in minutes. Once a developer has built the screen, connected it to data, written tests and passed it through review, the same change touches several layers. Once the app is live, it also has to be released through the app stores and may need a migration for existing users.

We cannot give you a single universal multiplier, because it varies enormously with the type of change. A colour change stays cheap at every stage. A change to how accounts, permissions or payments work is expensive the moment code exists. What is reliably true is the ordering: the later a decision is changed, the more it costs.

Type of change Cost in design Cost once code exists
Label, copy or colour tweak Minutes Small, but still needs testing and a release
Moving an element within a screen Minutes Small to moderate
Changing the order of a flow Hours Moderate: screens, navigation and tests change
Adding a new screen or state Hours to a day Moderate to high: new build, test and review
Changing what data a screen needs A day High: touches the back end, the API and several screens
Changing the account or permission model Days Very high: affects almost everything built so far
Bar chart showing that the cost of changing a design decision rises at each project stage, from design to after launch.

The chart above shows the same ordering as a simple illustration. It is a rule of thumb, not a measured result, and the real gap depends on the change.

How a fixed price changes the picture

Rounded Labs works to a fixed price agreed before development starts. Our projects typically run from £30,000 to £250,000+ depending on scope, and the figure is set against a defined design. That arrangement works well for both sides, but only when the design is defined. If the signed-off package is vague, the price is vague too, and every dispute becomes an argument about what was meant.

A clear sign-off therefore does two jobs. It tells developers exactly what to build, and it tells you exactly what you are paying for. If you want to understand why we choose this model, read Fixed price vs time and materials for app projects. For the budget side of a late change, How to cut app development costs without cutting quality explains where savings are real and where they are false economies.

What should be in a sign-off package?

Ask your design team to hand over a package, not a link to a few pretty screens. A good package contains the following.

Item What to look for
Full screen set Every screen in scope, including login, settings, empty and error screens
States Loading, empty, error, offline, success and disabled versions of key screens
User flows Maps showing how a person moves from open to goal, including the unhappy paths
Clickable prototype A prototype you can use on a real phone, not just view on a laptop
Content Real text, not “lorem ipsum”, including error messages and button labels
Design system Colours, type, spacing and components, so developers build once and reuse. See What is a design system?
Exclusions list Features that are deliberately not in this version

The states row is where most gaps hide. A designer may draw the happy path for a payments screen but not what the user sees when the card is declined. If it is not designed, a developer will improvise it, and you will not like the result.

Screens: complete, not representative

A common failure is receiving a “representative” set of screens: the home screen, a typical list and a detail page, with a note that the rest “follow the same pattern”. That is a sketch of the app, not the app. Ask for a screen inventory, which is a simple list or spreadsheet of every screen with a name, a purpose and a link to the design. Count them. If the inventory says 42 screens and the design file shows 18, you know where the gap is.

Do not forget the screens nobody thinks about until launch week: terms and privacy pages, account deletion, notification settings, the screen that appears when the app needs an update, and the screens for people who say no to permissions such as location or notifications.

States: the hidden half of the design

Every screen that shows data or accepts input has more than one state. A list can be loading, empty, full, failed or partially loaded. A form can be pristine, filled, invalid, submitting, successful or rejected by the server. The table below is a starting catalogue to check against each key screen.

State Question to ask Example
Loading What does the user see while data arrives? A skeleton list rather than a blank screen
Empty What is shown before there is any data? “No orders yet” with a clear next step
Error What happens when something fails? A plain message and a retry button
Offline What works with no signal? Cached content with a banner
Success How is a completed action confirmed? A confirmation screen or message
Disabled Why can’t I press this? A greyed button with a short reason
Partial What if only some data arrives? A list with a “could not load” row
Permission denied What if the user refuses access? A screen explaining how to enable it later

If you want a deeper treatment of offline behaviour, see How to make your app work offline, because offline states change the design more than most founders expect.

Flows: including the unhappy paths

A flow map shows how a person gets from opening the app to achieving a goal. The happy path is usually well drawn. Ask to see the others: what happens if a payment fails, if the user abandons halfway and returns tomorrow, if their session expires on a form, or if they are a new user without any data. Each unhappy path either has a design or will be improvised.

Content: real words, not placeholders

Designs with placeholder text hide problems. A button label that fits in English may not fit once translated. An error message that nobody has written will be written by a developer at the last minute, in developer language. Insist on real text for headings, buttons, empty states, errors and confirmations. If content depends on a third party, such as legal wording or product descriptions, name who owns it and when it will arrive.

The design system: build once, reuse everywhere

A design system is the shared set of colours, type styles, spacing rules and components that every screen draws from. When it is complete, developers build a button once and reuse it. When it is missing, every screen is a one-off, build time rises and the app drifts into inconsistency. Check that the system includes interactive states for each component (pressed, focused, disabled) and that sizes and spacing are given as numbers a developer can use. What is a design system? explains the idea in plain English.

Developer notes and assets

The package should also include what a developer needs to build without guessing: exported icons and images in the right formats and sizes, font files and licences, animation notes (what moves, how long, what triggers it), and any behaviour that is not obvious from a static screen, such as what happens when a list is pulled down or a card is long-pressed. If analytics matter to you, add a short list of the events you want tracked, since App analytics: what to track from day one is far easier to follow when the events are decided before build.

The exclusions list

The shortest and most valuable part of the package is a list of what is not included. For example: “No tablet layouts in this version. No dark mode. No in-app chat. No multi-language support. Push notifications are limited to order updates.” Writing exclusions down turns vague hopes into agreed boundaries. It also protects you, because a later request that matches an exclusion is clearly a change rather than a misunderstanding. A ranked list such as the one in How to choose features for version one is a good source for it.

How do you check the designs against what you asked for?

Take your user stories or feature list and walk through each one in the prototype. Tick off every story, and write down any that cannot be completed. Our guide to writing user stories explains the format that makes this check quick.

Then check the scope in both directions:

  • Missing: a story in your list that has no screen.
  • Extra: a screen or feature in the design that was never agreed. Extras are not free. Each one adds build and test time and may push you past your fixed price or deadline.

If you have a ranked feature list, such as the one from How to choose features for version one, check that nothing marked “later” has crept into the designs. If you use a prioritisation method like the one in How to prioritise a product backlog with MoSCoW, the “should” and “could” items are the ones most likely to appear in designs uninvited.

Build a traceability table

The simplest way to do this check is a table that links each requirement to the screens that deliver it. It takes an hour or two and often finds more problems than any design review meeting.

Requirement Screens Prototype tested? Status
A new user can register with email Welcome, Register, Verify email Yes Complete
A user can reset a forgotten password Login, Reset request, Reset confirm Yes Missing “link expired” state
A user can add a payment card Payment methods, Add card Yes Complete
A user can delete their account Settings, Delete account No No screen yet
An admin can refund an order None No Out of scope? Confirm

The last row is the useful one. A requirement with no screen is either a gap to be designed or a feature to be moved to the exclusions list. Either answer is fine. Not knowing is the problem.

Check the prototype, not the pictures

Static screens flatter a design. A prototype you can tap through on a phone shows what a screenshot cannot: whether a thumb can reach the main action, whether the back button behaves, how long a flow feels. Do the check on a real phone, in the sort of lighting and posture your users will have. If your team uses a design tool such as Figma, most can share a prototype link that opens on a phone.

Who should approve the design?

Gather input from several people, but let one person approve. Committee sign-off is a common cause of delay and contradictory changes.

  • The approver: the product owner or founder with budget authority. Their name and date go on the approval.
  • A developer: reviews feasibility, including what the design assumes about data, APIs and device features.
  • Compliance or legal: needed if the app handles payments, health data, children’s data or regulated advice.
  • Support or operations: can spot flows that will generate help requests.
  • A few target users: even five people trying the prototype for ten minutes will find problems your team no longer sees.

Set a review deadline, usually three to five working days, and tell reviewers that comments after the deadline go to the change log. This keeps feedback focused.

Who does what: a simple responsibility table

Person Role in sign-off What they deliver Can they block?
Product owner or founder Approver A written, dated approval Yes, by not approving
Lead designer Presenter The package, answers to questions No
Lead developer Feasibility reviewer A written list of concerns and estimates Yes, on feasibility only
Compliance or legal Specialist reviewer Comments on wording, consent and risk Yes, on regulated points only
Support or operations Consulted Likely help requests and missing admin tools No
Marketing or brand Consulted Brand and store listing needs No, unless brand rules are breached
Test users Evidence Observed problems from prototype use No, but their evidence counts

The “can they block” column matters. A developer can block a design that cannot be built within the plan, and a compliance reviewer can block wording that breaks a rule. Nobody else gets a veto. That keeps the process fast while still giving specialists the authority their expertise deserves.

What a good approver does

A good approver does five things. They read the package before the meeting. They hold the line on the deadline. They separate “must change before build” from “nice to have later”. They ask what a change costs before asking for it. And they sign, because a design that is never approved is a project that never starts. If the approver is the founder and the founder is also the busiest person in the company, schedule the review as a protected block, not a task squeezed between calls.

When there are several decision makers

Some organisations genuinely have several stakeholders, such as a marketing director, a head of product and a finance lead. In that case agree before design starts who holds the pen at sign-off, and what the others can do. A workable pattern is a single approver who must record the views of the others and state why a request was accepted or declined. It is not a democracy. It is one person who has listened.

Not sure your designs are ready to build from? We will look at them with you and tell you what is missing before it costs money. Book a 30-minute call with a co-founder.

What should you test before you approve?

Run through four checks. Each one is cheap now and expensive later.

  1. Usability. Hand the prototype to five people from your target audience and ask them to complete three tasks without help. If two or more get stuck in the same place, fix the screen.
  2. Accessibility. Check text contrast, tap target sizes, scalable text and labels for screen readers against the Web Content Accessibility Guidelines (WCAG 2.2) at level AA. For apps sold in the EU, the European Accessibility Act has applied since June 2025 to many consumer services, so check whether it covers you.
  3. Platform conventions. Apple’s Human Interface Guidelines and Google’s Material Design set expectations for navigation, gestures and controls. Designs that fight them tend to feel wrong to users and can attract store review questions.
  4. Feasibility. The developer confirms that every interaction is possible within your timeline, that the data the screens need exists, and that any third-party services behave the way the design assumes.

Two further checks are worth adding for most products: content and compliance review, and a performance sanity check on anything heavy such as maps, video or long lists.

The five steps that turn a finished design into a clear, written sign-off.

Usability: how to run five short sessions

You do not need a lab. Recruit five people who resemble your users, give each the prototype on a phone and ask them to do three realistic tasks, such as “find a product and buy it” or “change your delivery address”. Say nothing about how. Watch where they hesitate, tap the wrong thing or ask a question. Write down the exact words they use for things, because those words belong on your buttons. If two or more people stumble in the same place, the screen is at fault, not the people. Our guide to running a usability test on a budget covers the method, and How to run user interviews before building helps if you are still learning what users need.

Accessibility: what to check at design stage

At design stage you can check most of the important points without any code.

Check What to look for
Colour contrast Text and key icons must stand out from the background. WCAG 2.2 AA asks for a contrast ratio of at least 4.5 to 1 for normal text
Tap targets Buttons and links should be large enough to press accurately with a thumb
Text scaling The layout should survive the user making system text larger
Meaning without colour Errors and statuses should not rely on colour alone
Labels Every icon button and field needs a text label that a screen reader can read
Focus order The order a screen reader moves through the screen should match the visual order
Motion Animations should be avoidable for people who ask the device to reduce motion

Do this before sign-off because fixing contrast or layout after the design system is built into code means touching every screen. The W3C publishes the Web Content Accessibility Guidelines and, for UK public services, the GOV.UK Service Manual gives practical guidance on accessible design. For the legal side of accessibility in the EU and UK, see App accessibility: the European Accessibility Act and UK guidance. This is general information, not legal advice. Laws and dates change, so check the official source for your situation.

Platform conventions: respect the habits people already have

People spend most of their phone time in other apps, so they arrive with expectations. On iPhone, a swipe from the left edge usually goes back. On Android, the system back gesture or button does something similar. Tab bars, sheets, menus and dialogs behave in certain ways on each platform. Apple’s Human Interface Guidelines and Google’s Material Design document these patterns. You do not have to follow every rule, but you should know when and why you are breaking one. If you are building a single app for both platforms, What is a cross-platform app? explains how teams handle the differences.

Feasibility: the developer’s review

Ask the lead developer to go through the design with three questions in mind. Can every interaction be built in the time available? Does the data each screen shows actually exist, and where does it come from? Does anything depend on a third-party service, device feature or permission that behaves differently from how the design assumes? A thirty-minute walk-through often turns up items that would have caused a week of rework, such as a map feature that needs a paid licence, a camera screen that behaves differently on older phones, or a design that assumes real-time data from a system that updates overnight.

Content and compliance

If your app handles payments, health information, children’s data or regulated advice, a specialist should read the words as well as look at the layout. Consent screens, risk warnings, terms and privacy wording are part of the design. Get them reviewed now, because a change to legal wording often changes layout, and a missing consent step can change the whole flow. Our guide to UK GDPR for mobile apps covers the privacy points founders most often miss.

Performance sanity check

Designs can quietly demand heavy work: large images on every card, auto-playing video, live maps, long lists with filters. Ask the developer whether anything will be slow on a mid-range phone with a poor connection. Fixing a slow design is much easier on paper. If your product is likely to run into trouble here, Why apps feel slow, and how to fix it explains the usual causes.

What does the full pre-sign-off checklist look like?

Use this as a working checklist. Copy it into your project notes and tick each line. A line you cannot tick is a question for the design team.

Completeness

  1. A screen inventory exists and every screen on it has a final design.
  2. Login, registration, password reset, settings, account deletion and legal pages are designed.
  3. Key screens have loading, empty, error, offline and success states.
  4. Every flow in the map has a design for the unhappy path as well as the happy one.
  5. All text is real, including errors, empty states and confirmations.
  6. The exclusions list is written and agreed.

Traceability

  1. Every user story or requirement maps to at least one screen.
  2. Every screen maps to at least one requirement, or is explained.
  3. Nothing marked “later” in the feature list appears in the designs.

Quality

  1. Five people from the target audience completed the main tasks on the prototype.
  2. Accessibility checks at WCAG 2.2 AA have been run on the design.
  3. The design follows platform conventions or deliberately explains where it does not.
  4. The design system covers colours, type, spacing, components and their states.

Feasibility and risk

  1. The lead developer has reviewed the whole design and listed concerns in writing.
  2. Third-party services, licences and device features have been confirmed.
  3. Compliance or legal has reviewed consent, risk and privacy wording where relevant.
  4. Store rules have been checked: see Why Apple rejects apps, and how to avoid it.

Decision

  1. One named approver has been identified.
  2. The review deadline has passed, and late comments are in the change log.
  3. The approval record names the version, date, approver and exclusions.

How do you run the sign-off itself?

The sign-off is a short, structured event, not a debate. By the time you meet, everyone should have reviewed the package and sent their comments.

Before the meeting

Circulate the package at least three working days ahead. Include the screen inventory, the prototype link, the exclusions list, the traceability table and a summary of open comments with the designer’s response to each. Ask reviewers to mark each comment as “must fix before build”, “should fix” or “later”. Without that sorting, every comment feels equally urgent.

In the meeting

A sensible agenda takes forty-five to sixty minutes.

  1. Walk through the prototype on a phone, end to end (15 minutes).
  2. Review the open comments marked “must fix” and agree the answer to each (15 minutes).
  3. Confirm the exclusions list (5 minutes).
  4. Developer states any remaining feasibility concerns (10 minutes).
  5. Approver confirms whether they are ready to sign, or what remains (5 to 10 minutes).

After the meeting

Write the decision down the same day. The record should be short and exact.

Field Example entry
Version approved Design set v1.4, prototype link and date of last edit
Approver Name and role
Date The date of approval
Conditions “Approved subject to the three must-fix items below being completed by Friday”
Exclusions The agreed list
Open items Anything logged for later, with owner
Change process How requests will be logged and decided

An email that sets out these fields is enough for most projects. Keep it with the design files so that anyone who joins the project later can see what was agreed.

Conditional approval

Sometimes the design is nearly ready. It is acceptable to approve with conditions, provided the conditions are short, specific and have an owner and a date. “Approved once the declined card state and the account deletion screen are added” is a good condition. “Approved, but we may want to revisit the navigation” is not a condition, it is a doubt, and it means you are not ready to sign.

What does a worked example look like?

Take a first-time investor app, similar in spirit to the one we designed for Dabbl. The founder reviews the prototype and asks four questions before approving.

  • Is the money flow complete? The designs show “deposit funds” and “buy” but not a failed bank transfer, a market-closed message or a partial fill. These states are added before approval.
  • Does the language suit a beginner? Terms such as “limit order” get plain-English labels and a short explainer.
  • Do the risk warnings read clearly? Compliance reviews the content and wording, not just the layout.
  • Can a developer build the charts as drawn? The developer flags that one animated chart would add weeks. The team agrees a simpler version for launch and lists the animation as a later improvement.

None of this is exotic. It takes a few days, and each fix costs a fraction of what it would after the screens were coded. For a fuller picture of how we approach a regulated product, read the Dabbl case study.

A second example: a retail app with a loyalty feature

The following is a hypothetical, built to show the method, not a description of a client project. A retailer wants an app with browsing, a basket, checkout, order tracking and a points scheme. The traceability table shows that “points balance” has a screen but “points expiry” does not, and nobody has decided what happens when a returned order reverses points that have already been spent. The developer notes that the points balance comes from a loyalty system that updates once a day, so the design’s “live balance” would show stale numbers.

The group has three options. Add the missing screens and rules now, which takes two days of design. Move points expiry to the exclusions list and state that returns do not reverse points in version one, which costs nothing but needs a business decision. Or approve as drawn and discover the gaps in testing. The first two are cheap. The third is the usual choice by default, and the most expensive. Large retail work, such as the app modernisation we did for Superdry and the app, mobile site and eBooks API we built for Waterstones in 12 weeks, depends on this kind of early clarity because many systems feed one screen.

What should be frozen, and what can stay flexible?

A frozen item is one that cannot change without going through the change log. A flexible item can still be adjusted by agreement between designer, developer and approver without formal sizing. Being explicit about which is which avoids both rigidity and chaos.

Frozen at sign-off Flexible during build
The list of screens and flows Small spacing and alignment adjustments
The data each screen shows Exact animation timing and easing
Navigation structure Wording tweaks that do not change meaning
Account, permission and payment logic Image choices, as long as the format is the same
Third-party services used Minor colour adjustments within the design system
The exclusions list Developer choices about internal code structure
Platforms and minimum OS versions Fixing visual bugs against the signed-off design

The principle is simple: anything that changes how much work there is, or how the product behaves, is frozen. Anything that polishes execution is flexible. If you are unsure which side something sits on, ask the developer whether it changes their plan. If yes, it is a change.

What happens if you want changes after sign-off?

Changes will come. The question is how they are handled. Agree the process before you sign.

  • Log it. Every request goes in a change log with a description, a date and who asked.
  • Size it. The team states the effect on time and cost before work starts.
  • Decide it. The approver says yes, no or later. Later goes on the backlog for the next version.

Because we price projects as a fixed price agreed before development starts, any approved change is quoted as a defined addition, so you always know the figure before you commit. Our guide to managing scope changes covers the approach in more detail. As a rule, changes to copy and small visual tweaks are cheap, while changes to flows, data or navigation after build starts are not.

Four kinds of request

Not every request after sign-off is a change in the commercial sense. Sorting them correctly keeps arguments short.

Three cards showing how requests after design sign-off are sorted into defects, clarifications and changes.
Kind Meaning Who pays Example
Defect The build does not match the signed-off design The team fixes it as part of the project A button is the wrong colour compared with the design system
Clarification The design was silent or ambiguous and a decision is needed Usually absorbed if small, logged either way What the app shows when a list has 500 items
Change You want something different from what was approved Quoted as an addition Reordering the checkout steps
New feature Something that was never in scope Quoted as an addition or moved to version two Adding a wishlist

The row to watch is “clarification”. A developer asking “what should happen here?” is not a failure of the design process, since no design covers everything. But if clarifications are frequent and large, it is a sign that sign-off happened too early, and it is worth pausing to design the missing area properly.

A change log that works

A change log needs few columns. Keep it visible to everyone on the project.

ID Date Requested by Description Effect on time Effect on cost Decision
001 Week 3 Founder Add a “continue as guest” option at checkout 2 days Quoted addition Approved
002 Week 4 Marketing Change onboarding illustrations 1 day Within allowance Approved
003 Week 5 Support Add live chat 3 weeks Quoted addition Deferred to version two

The act of writing a request down often removes it. When the person asking can see that a small idea costs three weeks, many choose to wait.

How to say no without damaging the relationship

Developers and designers worry about being seen as obstructive when they decline a change. The log solves this by turning “no” into “later” or “here is the price”. The approver can then decide with full information. It also protects the team’s morale, since nobody is quietly absorbing extra work.

What are the most common sign-off mistakes?

These patterns show up repeatedly, and each one can be avoided.

  1. Signing off pictures, not a prototype. The static screens looked fine and the flow turned out to be clumsy.
  2. Signing off the happy path only. Errors, empty states and offline behaviour were improvised by developers.
  3. Letting reviewers join after the deadline. A new stakeholder arrives in week five with a list of changes and a different vision.
  4. No developer in the review. The design looked good and could not be built as drawn.
  5. Mixing opinion with requirement. A comment such as “I don’t like green” gets the same weight as “the checkout does not show the delivery cost”.
  6. No exclusions list. Everyone assumed their favourite feature was in.
  7. Approval by silence. “We did not hear back, so we started.” This leaves a project open to a dispute later.
  8. Skipping accessibility and store checks. Problems found at the end mean touching the whole design system.
  9. Treating sign-off as the end of design collaboration. The designer must stay involved during build to answer questions and review the result.
  10. Changing the approver. A new person takes over mid-project and rejects decisions already made. Name a deputy in advance.

If your project already shows warning signs, How to tell if an app project is off track and How to read an agency’s weekly report help you spot problems early, and How to rescue a failing app project is there if things have gone further.

Can you sign off in stages?

Yes, and for larger apps it is often the sensible route. Instead of one sign-off for the whole app, you approve a series of slices, for example onboarding and accounts first, then the core journey, then secondary features and settings. Each slice goes through the same checklist. Build starts on the first slice while later ones are still in design.

Staged sign-off has real advantages. It shortens the time before anyone writes code, and it lets feedback from the early builds inform later designs. It also has risks. Slices are never completely independent. A decision about accounts will affect settings, and a decision about payments will affect order history. To keep the risk low:

  • Sign off shared foundations first: the design system, navigation structure, account model and data model.
  • Keep a map of dependencies between slices, so a late change in one slice flags the others it affects.
  • Do not start building any slice whose dependencies are still open.
  • Hold a short check at the end of each slice to confirm the whole still hangs together.

If the project began with a discovery phase, the early outputs usually define these slices. What happens in a discovery phase explains how that early work is structured. If you are still deciding how much to prototype before committing, MVP vs prototype explains the difference, and What is an MVP? shows how to choose the scope of the first release.

Apple and Google each publish rules that apps must follow to be accepted into their stores. Many of these rules affect design, such as how you ask for permissions, how you present subscriptions and what you must show before a user creates an account. Apple’s App Store Review Guidelines and Google’s developer policies at developer.android.com explain the current position. Rules change, so check the official source at the time you sign off rather than relying on a summary.

Typical design points to confirm:

Area Design question
Account creation If users can create an account in the app, can they also delete it from the app?
Permissions Does each permission request have a clear reason shown first?
Payments Do digital purchases follow the store’s payment rules, and is pricing shown clearly?
Privacy Do the screens match the privacy information you will give the stores?
Content Is user-generated content moderated or reportable?
Sign-in If you offer social login, are the options and wording consistent with platform guidance?

Our guide to adding login and sign-up and adding in-app payments cover the build side of two of the riskiest areas. Where privacy law is involved, such as consent for tracking or children’s data, take advice from a qualified adviser. At the time of writing, requirements differ by country and by sector, so check the official regulator for your situation. This article is general information, not legal advice.

What happens after sign-off?

Sign-off is the start of build, not a pause in your involvement. The best projects keep a steady rhythm of short demos where you see working software against the signed-off designs. How to run a sprint demo covers what a good demo looks like, and How to give useful feedback on a test build shows how to give comments that developers can act on without reopening settled decisions.

Three habits make the next stage smoother:

  • Check each demo against the signed-off design, not against your memory of it.
  • Log differences as defects or changes, not as casual comments.
  • Keep the approver available. Developers will have questions, and a day’s delay on an answer can stall a whole feature.

After launch, the same discipline helps with version two. A tidy design file, a design system and a log of deferred requests give you a head start on the next phase, and How to plan an app redesign is a useful read if you are ever reshaping an existing product. Before the app goes live, run through App launch checklist: 30 steps before you publish. And for contracts, Who owns the code? IP, contracts and escrow for UK app projects explains how to make sure the design files and the code are yours.

How should you brief the team and prepare to sign off?

Good sign-offs begin long before the meeting. Three early habits help.

First, write a brief that makes the goals measurable. How to brief an app development agency shows what to include so that designers and approvers share a view of success. Second, write the specification in plain language so that the design can be checked against it. How to write an app specification (free template) gives a starting structure. Third, agree the sign-off criteria at the start of design, not the end. If the team knows the checklist above on day one, they will design the states and exclusions as they go, and the final review becomes confirmation rather than discovery.

If you would like a second opinion on a design before you commit, we can review it with you. Our productised services run at a fixed price, for example the Mobile Product Discovery Sprint at £9,500, which turns an idea into a prototype and a costed plan. See the pricing page for the full list, or book a call with a co-founder and we will tell you honestly whether your designs are ready to build from.

What should you do next?

If you have a design in front of you and a build date approaching, work through these steps in order.

  1. Ask for the screen inventory and count it against the design file.
  2. Build the traceability table from your user stories.
  3. Test the prototype with five people and note where they stumble.
  4. Ask the developer for a written feasibility review.
  5. Run the accessibility and store checks from this guide.
  6. Agree the exclusions list and the change process in writing.
  7. Name one approver, set a deadline and hold the sign-off meeting.
  8. Record the decision the same day, with version, date and conditions.

Following these steps takes days, not weeks, and it will do more for your budget than any later negotiation.

Frequently asked questions

How long should design review and sign-off take?

For a typical app, allow one to two weeks for the final review round: three to five working days for reviewers to comment, then a few days for the designer to apply fixes and for you to approve. Larger or regulated apps may need longer for compliance checks.

Can we start building before the whole design is signed off?

Yes, if the signed-off parts are independent. Teams often start with set-up work and well-defined features while later screens are still in design. The risk is that late design changes force rework in code already written, so only start on areas that are settled.

What if we sign off and then spot a problem?

Raise it straight away and log it as a change. If it is a genuine gap, such as a missing error state, the team will usually add it as a small, quoted addition. If it is a preference, decide whether it is worth the cost now or belongs in the next version.

Do we need a written sign-off or is an email enough?

An email that names the version of the designs, the date and the approver is enough for most projects. Keep it with the design files. What matters is that there is a clear record of what was approved.

Who owns the final design files?

This depends on your contract. Check that the agreement transfers the design files and the code to you on payment, and that you receive source files in a standard tool. Our guide to who owns the code covers the points to look for.

What if the approver is unavailable for several days?

Name a deputy before the project starts, with written authority to approve within agreed limits. If neither is available, the project waits, so protect the approver’s time in the plan. A delayed decision costs more than a rushed one only if it holds up the whole team.

Is it ever right to skip sign-off?

For a throwaway prototype or an internal experiment, a light version is fine. For anything that will be built to launch, skipping sign-off leaves nothing to measure the build against. Even a one-page approval with the exclusions list is better than nothing.

Official sources and further reading